Installing the panels is only half the job — DISCOM approval is what actually turns the system on for net metering.
The typical steps
- Submit application with system design and load details.
- Technical feasibility check by the DISCOM.
- Installation inspection and meter swap.
- Net-metering agreement signed and activated.
"Delays almost always come from paperwork mismatches, not the installation itself."
| Step | Typical time |
|---|---|
| Feasibility check | 5–10 days |
| Meter swap | 7–15 days |
Accurate paperwork starts with an accurate proposal and correct net-metering basics.